Home/Products
Product catalogue

Six families.
One tolerance standard.

Forging, stainless, steel casting, iron casting, aluminum casting and laser cutting — six process routes, one inspection standard, and a photographed sample of the parts we run in each of them.

Materials & finishing

What we can hold.

Family Typical materials Process Tolerance Finish options Lead time
Forging Parts 42CrMo, 20CrMnTi, C45 Closed-die forging + CNC ±0.02 mm Normalising, black oxide 15–25 days
SST Parts SS304, SS316L, SS303 CNC turning / milling ±0.005 mm Passivation, electropolish 10–20 days
Steel Casting Parts WCB, 4140, Mn13 Sand casting + machining ±0.05 mm Shot blast, primer 20–35 days
Iron Casting Parts HT250, QT500-7, GG25 Sand / investment casting ±0.05 mm Paint, phosphate 20–35 days
Aluminum Casting Parts ADC12, A356, AL-6061 Die casting + CNC ±0.02 mm Anodise, powder coat 15–25 days
Laser Cutting Parts SPHC, SS304, AL-5052 Fiber laser + bending ±0.1 mm Powder coat, zinc plate 7–15 days

Values are indicative — final tolerance and lead time are confirmed at RFQ.

Can't find your part?

Send the drawing — if we can't make it, we'll tell you who can.

Send a Drawing